Home News Archive eNewsletter RailPAC eNewsletter for October 27, 2014
eNewsletter

RailPAC eNewsletter for October 27, 2014

Share
Share

Construction to Impact Rail Service in October Complete Rail Closure October 25 -26  The weekend of October 25-26 will see rail service interruptions along the Coastal rail corridor from Oceanside to San Diego: COASTER: No COASTER service will be provided. AMTRAK – Amtrak trains will not operate between Oceanside and San Diego including the six select Amtrak ‘Rail 2 Rail’ trains that serve all eight COASTER stations. Amtrak passengers in possession of a valid fare will be granted access to NCTD BREEZE Route 101 at no additional charge. METROLINK: Metrolink trains will not be affected.During the weekend of October 25 and 26, the San Diego Association of Governments (SANDAG), and TASI will advance necessary construction work at three sites along the Coastal rail corridor in order to improve rider experience. Those sites are; the San Dieguito River Bridge; between Sorrento Valley Rd. and Miramar Rd., and between Taylor St. and Washington St.

October 27, 2014

The above copy of this enewletter is on a PDF file . If you would like to subscribe to this enewsletter write to nbraymer@xg1.b3e.myftpupload.com

Posts by Category

Posts by Year

Related Articles
Newswire

VIA Rail Canada turns to Stadler for new hybrid locomotives

MONTREAL — The Canadian government will spend Ca$1.6 billion (U.S. $1.14 billion)...

Newswire

Old Caltrain Locomotives Find New Life on Capitol Corridor

Some of Caltrain’s F40 locomotives escape the scrapper, pull (or push) trains...

Newswire

Unpacking rail earnings: How volume growth fuels merger talks

Railroads are seeing a significant upturn in Q2 earnings, with most Class...

Newswire

Amtrak outlines Horizon repair plans; shunt antenna program in bureaucratic logjam

Antenna delays keep Gold Runner cab cars sidelined Read more.